<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>SUSTAINABLE CARIBBEAN &#187; Wind Power</title>
	<atom:link href="http://sustainablecaribbean.com/category/wind-power/feed/" rel="self" type="application/rss+xml" />
	<link>http://sustainablecaribbean.com</link>
	<description>Everything Sustainable For the Caribbean</description>
	<lastBuildDate>Sun, 24 Jan 2010 20:28:16 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Peter Island, BVI Turns to Wind Power</title>
		<link>http://sustainablecaribbean.com/2009/09/peter-island-bvi-turns-to-wind-power/</link>
		<comments>http://sustainablecaribbean.com/2009/09/peter-island-bvi-turns-to-wind-power/#comments</comments>
		<pubDate>Sun, 20 Sep 2009 16:43:25 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Environment]]></category>
		<category><![CDATA[Wind Power]]></category>

		<guid isPermaLink="false">http://sustainablecaribbean.com/?p=171</guid>
		<description><![CDATA[Peter Island, BVI has announced plans to purchase and install of two 250 kW wind turbines on a southeast facing ridge of the island. Peter Island is located five miles south of Tortola.   It is anticipated two turbines will provide in excess of 60% of the peak load energy requirements on the island.   The proposed installation date is January 2010.
The [...]]]></description>
			<content:encoded><![CDATA[<p>Peter Island, BVI has announced plans to purchase and install of two 250 kW wind turbines on a southeast facing ridge of the island. Peter Island is located five miles south of Tortola.   It is anticipated two turbines will provide in excess of 60% of the peak load energy requirements on the island.   The proposed installation date is January 2010.<img class="alignright size-full wp-image-174" title="Wind_turbines" src="http://sustainablecaribbean.com/wp-content/uploads/2009/09/Wind_turbines.jpg" alt="Wind_turbines" width="300" height="240" /></p>
<p>The Peter Island Wind Project, the first commercial wind turbine installation in the British territory, will save more than 100,000 gallons of diesel fuel per year or approximately $250,000 annually.</p>
<p>Tim Currey, RA, NCARB, Director of Special Projects, URS Corporation states, “The Peter Island Wind Turbine Project will be a shining example of sustainability in the Caribbean environment. The project is a ‘win-win’ for all; The environment, Peter Island, the Resort and the entire BVI community. We are thrilled to be a part of this process.”</p>
<p>The wind turbine model selected is a WES30 Mk1 Hybrid from Netherlands-based, Wind Energy Solutions (WES). The turbine installation will be coordinated by Wolverine Power Solutions of Zeeland, MI and Kraus-Manning, Inc. (KMI) – Tortola will handle the Construction Management scheduling and services. Additional connectivity and controls design will be coordinated by Atlantic Controls based out of Fort Lauderdale, FL.</p>
]]></content:encoded>
			<wfw:commentRss>http://sustainablecaribbean.com/2009/09/peter-island-bvi-turns-to-wind-power/feed/</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
	</channel>
</rss>

